Case Study: Bespoke Waste Incineration Plant in La Collette Jersey
Matthews built a bespoke incineration facility housed within a new dedicated building for the Department of Infrastructure at La Collette Jersey.
...
Read MoreThe Menace of Plastic. A Worldwide Plague
It’s probably true to say that virtually everyone is now well aware of the risks that plastic, especially single-use plastic items such as bags, cups, bottles and drinking straws etc, pose to our plan...
Read MoreCase Study: Animal Remains Incineration Project
The Matthews team custom-designed, built, and installed a gas-fired rotary incinerator plant with a capacity of 700kg/hour in...
...
Read MoreCase Study: Saving Landfill Space and Transport Costs
The Hajj — an important pilgrimage to Makkah for Muslims everywhere — produces roughly 10,000 tons of animal waste over the five day festival. Historically, this waste has been landfilled, but MOMRA c...