Matthews designed, built, and installed a low capacity incineration plant capable of processing up to 800 kg/day of animal waste.
The Matthews team custom-designed, built, and installed a gas-fired rotary incinerator plant with a capacity of 700kg/hour in...
The Matthews team custom-designed, built, and installed a medical incineration plant to process approximately 175kg/h.
The Hajj — an important pilgrimage to Makkah for Muslims everywhere — produces roughly 10,000 tons of animal waste over the five day festival. Historically, this waste has been landfilled, but MOMRA contracted Matthews Environmental Solutions to provide an incineration solution