Low-Capacity Animal Incinerator for Processing Plant
- Category: Home Page Case Studies - EN-US
Matthews designed, built, and installed a low capacity incineration plant capable of processing up to 800 kg/day of animal waste.
Case Study: Animal Remains Incineration Project
- Category: Home Page Case Studies - EN-US
The Matthews team custom-designed, built, and installed a gas-fired rotary incinerator plant with a capacity of 700kg/hour in...
Case Study: Saving Landfill Space and Transport Costs
- Category: Home Page Case Studies - EN-US
The Hajj — an important pilgrimage to Makkah for Muslims everywhere — produces roughly 10,000 tons of animal waste over the five day festival. Historically, this waste has been landfilled, but MOMRA contracted Matthews Environmental Solutions to provide an incineration solution
Case Study: Medical Waste Incineration Plant in Poland
- Category: Home Page Case Studies - EN-US
The Matthews team custom-designed, built, and installed a medical incineration plant to process approximately 175kg/h.