HUMAN CREMATION CASE STUDIES

Case Study: 3 Cremator Installation in Belgium


Matthews built and installed a set of three cremators in Holsbeek, Belgium, each with independent flue gas cleaning systems. Featuring 1.1m front doors, rear-side ash discharge, an integrated ash cooling system, and an automatic coffin loader, these cremators are capable of 24-hour operation, and are each used for 6-7 cremations daily. The whole installation is compliant with European Waste Incineration Directive, and includes all necessary abatement systems.


INSTALLATION

Holsbeek, Belgium

NO. LINES

3 cremation system with 3 independent flue gas cleaning system

CREMATIONS PER DAY

6-7 /each CRM

EMISSIONS

In compliance with the European Standards and Regulations within the country of installation.

YEAR OF INSTALLATION

2012

TYPE OF CREMATOR FURNACE

  • CRM 6R High-Performance Cremator 
  • Front Door Opening, 1100mm
  • Ash discharge in the rear side of the machine
  • Integrated ash cooling system
  • Automatic coffin insertion system 
  • Flue gas cleaning with reagent injection system