HUMAN CREMATION CASE STUDIES

Case Study: 3 High-Efficiency Cremators Installed in Poland


Matthews built and installed 3 high-efficiency cremators in Poland with a complete flue gas cleaning system and an integrated ash cooling system. Each cremator featured a a 1.1m front door, rear-side ash discharge and an automatic coffin loader. These cremtors are also capable of 24-hour operation, and is used for 6-7 cremations daily. Each installed unit maintains compliance with all relevant European environmental regulations. 

INSTALLATION

DĄBROWA GÓRNICZA, Poland

NO. LINES

3 cremation systems with flue gas cleaning system

CREMATIONS PER DAY

6-7 /each CRM

EMISSIONS

In compliance with the European Standards and Regulations within the country of installation.

YEAR OF INSTALLATION

2015

TYPE OF CREMATOR FURNACE

  • 3 CRM 6R High-Performance Cremators
  • Front Door Opening,  1100mm
  • Ash discharge in the rear side of the machine
  • Integrated ash cooling system
  • Automatic coffin insertion system
  • Heater circuit connected to district heating network
  • Flue gas cleaning with activated carbon fixed bed