HUMAN CREMATION CASE STUDIES

Case Study: Complete Cremation System in Setubal, Portugal


Matthews built and installed a high-efficiency cremator system in Setubal, Portugal. Featuring a .9m front door, front ash discharge, and an manual coffin loader, this cremator is capable of 24-hour operation, and is used for 3-4 cremations daily. The installed system is in compliance with all relevant European environmental regulations.

INSTALLATION

Setubal, Portugal

NO. LINES

1 cremation system

CREMATIONS PER DAY

3-4 /each CRM

EMISSIONS

In compliance with the European Standards and Regulations within the country of installation.

YEAR OF INSTALLATION

2015

TYPE OF CREMATOR FURNACE

  • CRM 6R High-Performance Cremator 
  • Front Door Opening,  900 mm
  • Ash discharge in the front of the machine
  • Manual coffin insertion system