Low-Capacity Animal Incinerator for Processing Plant
- Category: Pet Cremation Case Studies
Matthews designed, built, and installed a low capacity incineration plant capable of processing up to 800 kg/day of animal waste.
Matthews designed, built, and installed a low capacity incineration plant capable of processing up to 800 kg/day of animal waste.