Case Studies

 

Permanently mounted into a modified 20′ ISO shipping container, which incorporated internal lighting, electrical sockets etc. The incinerator was fully tested and fired in our works and with the exception of the chimney, which is stowed in the container during shipping, which delivered in a fully assembled “ready to go” condition.

This installation was closely followed by installation on Papua New Guinea, New Caledonia and the island of Chuuk in Micronesia.